Project Name :
The Rama VII Bridge
Location :
Bangkok Metropolis
Client :
Department of Rural Roads (DRR)
Project Cost :
1,008 million Baht
Project Duration :
See below
Project Description :
Rama VII Bridge 290 m., viaduct 335.87 m. on Thonburi side and 184.80 m. on Phra Nakhon side, in total 933.19 m. of pre-stressed concrete box girder constructed by cast in-place balanced cantilever method.
Main Performance :
- Feasibility study and preliminary design (1981)
- Review the feasibility study and perform the detailed design (November 1985 – August 1986)
- Construction supervision (January 1990 – September 1992).