Project Name :
The MRT Yellow Line: Lat Phrao - Samrong
Location :
Lat Phrao – Samrong
Client :
Mass Rapid Transit Authority of Thailand
Project Cost :
54,768.455 million Baht
Project Duration :
September 2017 – December 2020
Project Description :
The Yellow Line (Lat Phrao - Samrong) is the straddle monorail system on the elevated structure, 30 kilometers with 23 stations. It is the interconnecting line between the Blue Line at Ratchada station (Lat Phrao station of the Blue Line) and the other 4 lines of mass transit system, i.e. the Grey Line (BMA) at Chalong Rat intersection, the Orange Line at Lam Sali intersection, Airport Rail Link at Rama IX interchange and the Green Line: Bearing - Samut Prakan at Samrong station.
Main Performance :
- To review the feasibility study of the project, act as the Consultant as prescribed in the Private Investment in State Undertaking Act, B.E. 2556 (2013), Chapter IV (Project Proposal) and to design, prepare the tender documents and other relevant documents
- To assist MRTA for the selection of contractors as required by the project.
- To prepare the written proposals for the selection of private entity for mechanical and electrical works, maintenance works and operation system works and to act as the Consultant as prescribed in the Private Investment in State Undertaking Act, B.E. 2556 (2013), Chapter V (Project Implementation) (February 2013 – January 2015).
- Construction supervision of civil works (September 2017 – December 2020).