Project Name :
The 3rd Runway Design Work for Suvarnabhumi Airport Expansion Project
Location :
Samut Prakan Province
Client :
Airports of Thailand Public Company Limited
Project Cost :
14,183 million Baht
Project Duration :
October 2017 – July 2018
Project Description :
To survey and design of airfield pavement for the 3rd runway, parallel taxiway, perimeter taxiway, ground improvement for the 2nd midfield satellite apron, extension of taxiway B, rescue and fire fighting building including other related components.
Main Performance :
- Survey and design of airfield pavement for the 3rd runway (60 m. wide, 4,000 m. long), parallel taxiway and other taxiway systems.
- Survey and design of perimeter taxiway and extension of taxiway B including other related systems.
- Survey and design of airfield lighting system and air navigation aids, aircraft navigation system and other systems related to aircraft movement.
- Soil improvement for airfield pavement, the 2nd midfield satellite apron, perimeter taxiway and rapid exit taxiway, extension of taxiway B to improve the access at the eastern apron including taxiways, apron service road, airside service road and emergency access road.
- Determine the location of rescue and fire fighting building for the 3rd runway with garage, related equipment and public utility system.