Project Name :
San Pa Tong - Hang Dong Bypass (Section 3)
Location :
Amphoe San Pa Tong, Hang Dong, Chiang Mai Province
Client :
Department of Rural Roads (DRR)
Project Cost :
1,200 million Baht
Project Duration :
April 2016 – June 2018
Project Description :
- A 2-lane asphaltic concrete road of 0.10 m. thick, 3.50 m. wide for each lane and 1.50 - 2.50 m. wide for each shoulder, totaling 13.592 km.
- 5 reinforced concrete U-turn bridges of 40.40 m. wide and 16.00 m. long.
- A reinforced concrete bridge of 12.00 m. wide and 36.00 m. long.
- 2 steel pedestrian bridges of 2.80 m. wide and 37.00 m. long.
- Installation of lighting system, traffic safety, drainage system and 3 locations of landscape work
Main Performance :
Construction supervision.