Project Name :
Greater Mekong Subregion (GMS) Highway Expansion Phase 2
Location :
Udon Thani – Sakon Nakhon – Nakhon Phanom – Roi Et - Yasothon Provinces
Client :
Department of Highways under the loan from Asian Development Bank
Project Cost :
5,691.20 million Baht
Project Duration :
September 2018 – September 2021
Project Description :
Widen from two to four lanes of the following six sections (142.42 km in total) of the national highway network:
1. NH 22 : Package I : Nong Han – Phang Khon (Section 1) (23.430 km)
2. NH 22 : Package J : Nong Han – Phang Khon (Section 2) (16.700 km)
3. NH 22 : Package K : Sakon Nakhon – Nakhon Phanom (Section 1) ( 17.906 km)
4. NH 22 : Package L : Sakon Nakhon – Nakhon Phanom (Section 2) (25.398 km)
5. NH 23 : Package M : Roi Et – Yasothon (Section 1) (25.900 km)
6. NH 23 : Package N : Roi Et – Yasothon (Section 2) (33.088 km)
Main Performance :
Construction supervision.