Project Name :
Double Track Railway from Thanon Jira Junction – Khon Kaen
Location :
Nakhon Ratchasima - Khon Kaen Provinces
Client :
State Railway of Thailand (SRT)
Project Cost :
26,007.20 million Baht
Project Duration :
February 2016 – February 2019
Project Description :
- Construct additional railway parallel to the existing railway and most of the railway is at-grade railway except at Khon Kaen Station where the railway is a double-track elevated railway for a length of 5.4 km.
- Installing signaling and telecommunication system and automatic train protection system along the railway.
- Construct 8 overpasses, 26 two-way U-turn bridges and 38 box culverts.
- Construct 84 railway bridges.
Main Performance :
Construction supervision.