Project Name :
Double Track Railway from Chachoengsao - Klong Sip Kao - Kaeng Khoi
Location :
Chachoengsao – Saraburi Provinces
Client :
State Railway of Thailand (SRT)
Project Cost :
11,348.35 million Baht
Project Duration :
See below
Project Description :
- Contract 1: Construct meter gauge double track railway parallel to the existing railway from Chachoengsao Station to Wihan Daeng Station for a length of 78 km and from Bu Yai Station to Kaeng Khoi Station for a length of 19 km including new Pai Naboon Station, construct 3 chord lines at Chachoengsao Station, Kaeng Khoi Station and Ban Pachi Station, install signaling and telecommunication system along Chachoengsao - Klong Sip Kao - Kaeng Khoi and along 3 chord lines, construct 57 railway bridges and 2 overpasses.
- Contract 2: Construct meter gauge double track railway parallel to the existing railway from the back of Wihan Daeng Station to prior to entering Bu Yai Station for a length of 9 km, construct single-track tunnel parallel to the existing single-track tunnel to pass under Khao Phra Phutthachai for a length of 1.2 km and construct 2 railway bridges.
Main Performance :
- Review feasibility study, detailed design, preparation of tender documents, cost estimation (May 2008 – January 2009)
- Construction supervision (February 2016 – February 2019)