Project Name :
Bhumibhol 1 & 2 Bridges on Industrial Ring Road
Location :
Bangkok Metropolis – Samut Prakan Province
Client :
Department of Rural Roads (DRR)
Project Cost :
8,740 million Baht
Project Duration :
October 2001 – March 2005
Project Description :
Contract 1: Southern Area
- Cable-stayed bridge crossing the Chao Phraya River with main span 398 m. and two pylons.
- Major interchange at Pu Chao Saming Phrai Road
Contract 2: Northern Area
- Cable-stayed bridge crossing the Chao Phraya River with main span 326 m. and back span 128 m.
- Major interchange at Rama III Road
Contract 3: Western Area
- Central interchange connecting two cable-stayed bridges
- Major interchange at Suk Sawat Road
Main Performance :
Construction supervision (completed 4 months ahead of schedule).