Project Name :
The MRT Chalong Ratchadham: Bang Yai – Bang Sue
Location :
Bang Yai – Bang Sue
Client :
Mass Rapid Transit Authority of Thailand
Project Cost :
60,019.50 million Baht
Project Duration :
See below
Project Description :
This route is 23 kilometers long and has 16 stations with elevated structure throughout stations. The project starts from Bang Yai, a northwestern district of Bangkok, then crosses under the Chao Phraya River at Phra Nang Klao Bridge then goes along Ratana Thibed Road to Nonthaburi Intersection and Wongsawang Intersection. Next, the route runs along Pracharat Road and merges with the Blue Line (Bang Sue-Tha Phra Section) at Tao Poon Intersection. It then merges with the Chaloem Ratchamongkhon Line at Bang Sue Station at the end of this section.
Main Performance :
- Feasibility study, detailed design, preparation of tender documents and cost estimation (January – July 2005)
- Review tender documents, conducting work in compliance with Act on Private Participation in State Undertakings, B.E. 2535 (PPSU) (June 2007 – January 2012)
- Construction supervision of civil works (April 2010 – November 2015)