Project Name :
The 3rd Eastern Bangkok Outer Ring Road (Highway 305-Highway 34 Section 1)
Location :
Bangkok - Pathum Thani Provinces
Client :
Department of Highways (DOH)
Project Cost :
25,000 million Baht
Project Duration :
March 2018 – March 2019
Project Description :
The project starts at Highway No.305 (about Sta.25+850) or about Km 45 of the 3rd Bangkok Outer Ring Road and ends at Km 70 of the project, totaling 25 km long.
Main Performance :
Detailed design, preparation of tender documents, cost estimation.