AEC

Project Detail

NAM MAE SAP HYDROELECTRIC PROJECT

AEC was retained by the Department of Energy Development and Promotion to perform engineering investigations and detailed design of the Nam Mae Sap Hydroelectric Project at Samoeng District, Chiangmai Province.  The project required the construction of a rockfill dam 20 m high with a crest length of 70 m and a powerhouse with an installed capacity of 1,450 kw.  The annual active regulating storage of the reservoir is 65,000 cu.m.