DETAILED DESIGN OF ELEVATED TOLLWAY ON HIGHWAY ROUTE NO. 35 (THON BURI-PAK THO), SECTION 2 (PART 2)



Detailed Narrative Description of Project :

A survey and detailed design of an elevated tollway on Highway Route No. 35 (Thon Buri-Pak Tho), Section 2 (Part 2) to fulfill the project development on engineering and be consistent with the environmental and socio-economics conditions.  The alignment starts at Interchange Highway Route Nos. 35 (Thonburi-Pak Tho) and 3097 (Amphoe Ban Phaeo Intersection) (about Sta. 41+500) and ends at Interchange Highway Route No. 3097 (Samut Songkram Intersection) (about Sta. 62+800), totaling about 21 km long.

Detailed Description of Actual Services Provided :

.  Survey and collect data of the existing traffic and analyze the future traffic volumes.

.  Assess the initial environmental impact.

.  Study interchange configurations and make comparison.

.  Design pavement and analyze the settlement.

.  Perform the detailed design of geometry, structure, drainage system, electrical system, utilities and landscape.

.  Survey properties for initial land acquisition.

.  Perform soil testing and material surveying.

.  Arrange public participation activities.

.  Prepare tender documents and estimate construction cost.