AEC
  • Highways 2
  • Highways

Project Detail

SURVEY AND DETAILED DESIGN OF A 4-LANE HIGHWAY OF NORTHERN NAKHON RATCHASIMA RING ROAD SECTION 2

 
Detailed Narrative Description of Project :

A survey and detailed design of a-4 lane highway or more of Northern Nakhon Ratchasima Ring Road Section 2 linking Highway Route No. 2068 and Highway Route No. 205, totaling about 23 km long including a design of interchange at Highway Route No. 205 Intersection to suit the geography, highway network and traffic volumes in the future.  Drainage system, relevant utilities and other necessary components shall also be designed to enable the convenience, rapidness and safety for the most efficient traffic and the mitigation of impacts on communities and environments.


Detailed Description of Actual Services Provided :

.  Survey and collect data of the existing traffic and analyze the future traffic volumes.

.  Assess the initial environmental impact.

.  Study interchange configurations and make comparison.

.  Design pavement and analyze the settlement.

.  Perform the detailed design of geometry, structure, drainage system, electrical system, utilities and landscape.

.  Survey properties for initial land acquisition.

.  Perform soil testing and material surveying.

.  Arrange public participation activities.

.  Prepare tender documents and estimate construction cost.