FEASIBILITY STUDY AND DETAILED DESIGN OF THE CONSTRUCTION OF STUNG BOT BORDER CONTROL FACILITY AND ACCESS ROAD TO NATIONAL ROAD NO. 5 PROJECT, THE KINGDOM OF CAMBODIA



Detailed Narrative Description of Project :

The feasibility study and detailed design of Stung Bot Border Control Facility on the area of 600x300 m. or about 180,000 sq.m. (112.5 rai) consists of border control facility, buildings, cargo distribution center and container yard, utilities systems, facilities and access road from Thai border to Ban Stung Bot to National Road No. 5, the Kingdom of Cambodia.

Detailed Description of Actual Services Provided  :

.  Survey and collect data of the existing traffic and analyze the future traffic volumes.

.  Assess the initial environmental impact.

.  Study interchange configurations and make comparison.

.  Design pavement and analyze the settlement.

.  Perform the detailed design of border control facility, buildings, cargo distribution center and container yard, utilities systems and other facilities.

.  Perform the detailed design of geometry, structure, drainage system, electrical system and landscape.

.  Survey properties for initial land acquisition.

.  Perform soil testing and material surveying.

.  Arrange public participation activities.

.  Prepare tender documents and estimate construction cost.