PROJECT MANAGEMENT CONSULTANT FOR THE CONSTRUCTION OF FLYOVER IN YANGON, MYANMAR - DETAILED DESIGN, CONSTRUCTION COST ESTIMATION AND CONSTRUCTION SUPERVISION

 

Detailed Narrative Description of Project :

The project is to construct 3 flyovers as follows:

1.  Shwegondine Flyover at Shwegondine-Kabaaye Pagoda Intersection, total length of 412 m.
2.  Bayintnaung Flyover at Bayintnaung-Thamine Railway Station Road Intersection (north-south, 2nd layer), total length of 287 m.
3.  Bayintnaung Flyover at Bayintnaung-Thamine Railway Station Road Intersection (east-west, 3rd layer), total length of 612 m.

Detailed Description of Actual Services Provided  :

The consulting services are divided into 3 parts as follows:

.  Part 1 - Geometric design, structural design, drainage system design and traffic facilities design.
.  Part 2 - Construction cost estimation.
.  Part 3 - Construction supervision.