AEC
  • Highways 2
  • Highways

Project Detail

CONSTRUCTION SUPERVISION OF ROAD NO. NGOR KRATHUM BAEN COMPREHENSIVE TOWN PLAN OF SAMUT SAKHON PROVINCE

 

Detailed Narrative Description of Project :

The Construction of Road No. Ngor Krathum Baen Comprehensive Town Plan of Samut Sakhon Province starts at STA. 0+000 of Petchkasem Intersection (Highway Route No. 4) that intersects Thanon Phutthamonthon Sai 4 and Road No. Ngor Krathum Baen Comprehensive Town Plan which is Road No. Ngor-Thanon Phutthamonthon Sai 4 Flyover at present.  The construction shall be on the existing Road No. Ngor until the ending point at STA. 7+445 which is the merging point with Krathum Baen Interchange (Thanon Setthakit).  The work is to demolish the existing road, elevate the embankment, construct an 8-lane asphaltic concrete road including 2 sides of footpaths, extend the span of the existing parallel bridges, construct a new 8-lane bridge, improve the U-turn under the bridge, undertake landscaping work, provide electrical and lighting system, traffic safety and drainage system.

Detailed Description of Actual Services Provided :

.  To approve the contractor's work program and method statement.
.  To execute the construction supervision and contract administration including quality control and maintenance of the project.
.  Take measurement for payment and maintain a permanent record of all works.
.  Approve and/or issue working drawing and prepare as-built drawing.
.  Certify payments for the work against the relevant Bill of Quantities.
.  To supervise the environmental monitoring during the construction period.
.  Evaluate claims, disputes, extensions of time and the like.
.  Undertake the final construction inspection and prepare certification for completion of the project.