CONSTRUCTION SUPERVISION OF THE NORTH-SOUTH ECONOMIC CORRIDOR - INTERNATIONAL BRIDGE ACROSS THE MAE KLONG RIVER (HOUAYXAY-CHIANG KHONG)



Detailed Narrative Descriptive of Project :

The project is to construct a major 2-lane bridge over the MekongRiver, connecting roads, traffic changeover and border control facilities, located at Houayxay on Lao PDR side and Chiang Khong on Thailand side.  Total project road length is approximately 11 km. including main bridge with length of 480 m. and approach viaducts 150 m. on Thailand side.
 

Detailed Description of Actual Services provided :

Pre-construction Process

·      Assist and advise the clients to pre-qualify the applicants for tendering.

·      Assist the clients to evaluate and select the qualified applicants.

·      Assist the clients in preparation of tendering and evaluation for bidding and contract document for signing with the awarded applicant.

Construction Supervision

·      To approve the contractor’s work program and method statement.

·      To execute the construction supervision and contract administration including quality control and maintenance of the project.

·      Take measurement for payment and maintain a permanent record of all works.

·      Approve and/or issue working drawing and prepare as-built drawing

·      Certify payments for the work against the relevant Bill of Quantities.

·      To supervise the environment monitoring during the construction period.

·      Evaluate claims, disputes, extensions of time and the like.

·      Undertake the final construction inspection and prepare certification for completion of the project.