AEC
  • Bridges

Project Detail

PAK KRET BRIDGE AND CONNECTING ROAD CONSTRUCTION PROJECT

AEC was appointed by the Public Works Department to conduct a Feasibility Study and an Initial Environmental Examination of the Pak Kret Bridge, which starts at the Pak Kret Intersection and crosses over the Chao Phraya River.  The Project also included connecting roads which end at the Rattanathibet Road and the Outer Ring Road.  The total project length was approximately 15 km.

Later in a separate contract, AEC was also appointed to undertake the detailed engineering design and preparation of tender documents.