CONSTRUCTION SUPERVISION OF THE DAO KANONG - PORT SECTION (CHAO PHRAYA RIVER CROSSING EXCLUDED) OF THE FIRST STAGE EXPRESSWAY SYSTEM IN BANGKOK

Construction of the Dao Kanong-Port Expressway is divided into two parts.  Part I is the Chao Phraya River Crossing at Wat Sai which was constructed by others.  Part II, which is the portion of this construction project, is aligned on both sides of the Chao Phraya River crossing from Thonburi-Pak Tho Highway at Dao Kanong to Suk Sawat Road and from Riverside Road near Wat Sai to the Port area, connecting to the Din Daeng-Port Expressway near Nang Linchi Road.  In addition, along both sides of the expressway between Riverside Road near Wat Sai and Nang Linchi Road, part of the Middle Ring Road of the Bangkok Metropolitan Administration (BMA) is also included in this construction project.

The Total length of the expressway on the Thonburi side is 4.5 km. and on the Bangkok side is 2.7 km.  The total length of all BMA’s Roads is 5.2 km.

The Works are divided into eight main contracts, six contracts for civil works and the remaining two for electrical and mechanical works.

Detailed Description of Actual Services provided :

  • Assist ETA in pre-qualification of bidders
  • Setting out, inspection and testing of materials
  • Recommendation regarding acceptance or rejection of work
  • Preparation of variation orders & shop drawings
  • Measurement of quantities
  • Certification of monthly estimates
  • Review and recommendations of claims
  • Monthly progress reports
  • Issuance of completion certificates
  • Final inspection after maintenance period
  • Issuance of maintenance certificates