AEC
  • Expressways

Project Detail

DETAILED DESIGN AND CONSTRUCTION SUPERVISION OF ACCESS RAMP TO ROUTE AREA PROJECT

The project comprises of an exit ramp connecting to Bang Chak off ramp and access road connecting to the first stage expressway system at grade and access to PTT rest area.

Detailed Description of Actual Services provided :

  1. Detailed engineering design for access road and access ramp to PTT rest area.
  2. Layout parking area and traffic circulation in the rest area.
  3. Layout storm drainage system.
  4. Preparation of drawings and documents.
  5. Coordination of the project for permission of the construction
  6. Construction supervision for the access road.