AEC
  • Expressways

Project Detail

DON MUANG TOLLWAY EXTENSION - AS TURNKEY DESIGN CONSULTANT FOR RTAF TO RANGSIT SECTION

     

This is an extension of Don Muang Tollway to the north, contracted by Department of Highways on a design-built turnkey basis.  The viaduct of 6 traffic lanes runs from sta: 26+358 to sta: 33+700, approximately 7.342 km.  The construction was expedited to be complete within 12 months, in time for traffic service during the 1998 Asian Games in Bangkok.

Detailed Description of Actual Services provided :

  • Topographic survey
  • Geotechnical investigation
  • Geometric design
  • Viaduct and structural design
  • Design of lighting, toll plaza, central building etc.
  • Giving technical advice during construction