DETAILED DESIGN OF TRACK DOUBLING PROJECT - PACKAGE 2 (TDPP2)

The objective of the Double Tracking Project is to improve the efficiency of the railway system and increase the number of train operations.  Package 2 includes four lines of railway with total length of 174 km. as detailed below :

Section 1 :  Hua Mak Station (km. 15+184) to Chachoengsao Junction (km. 60+993), a route length of 45 km.

Section 2 :  Taling Chan Junction (km. 6+035) to Nakhon Pathom Station (km. 48+126), a route length of 42 km.

Section 3 :  Ban Phachi Junction (km. 89+950) to Map Kabao Station (km. 134+300), a route length of 44 km.

Section 4 :  Ban Phachi Junction (km. 89+950) to Lop Buri Station (km. 132+810), a route length of 43 km.

AEC was mainly involved in Sections 3 and 4.

Detailed Description of Actual Services provided :

  • Perform Topographic Survey
  • Perform Geotechnical Investigation
  • Prepare Train Operation Plan
  • Location of Second Track and Station Layout
  • Signals and Telecommunications
  • Track Design
  • Embankment Design with ground improvement in soft soil sections
  • Bridge, Building and Structural Design
  • Prepare Tender Document