TRACK DOUBLING AND INSTALLATION OF SIGNALLING AND TELECOMMUNICATION SYSTEMS PROJECT : CHACHOENGSAO TO LAEM CHABANG (TDCSL)

   

A total distance of the project is 78 km. as following details:

  • Earth works 900,000 m3.
  • Concrete bridge & viaducts 23 No. (including Bangpakong river bridge, length 200 m.)
  • Building 13 units
  • Precast concrete pile (to protect embankment settlement 1,6000,000 m.)
  • Reinforced concrete works 95,000 m3.
  • Railway track 100,000 m3.
  • Signalling & Telecommunication Works 9 stations.

The Details of the project can be classified in 2 parts.

Part I  -  Work duration 8 months

Drawings collection an revision, tender documents production, tender management, tender qualification and technical evaluation, e-auction management, preparation for signer contract.

Part II -  Work duration 28 months

Construction supervision of track doubling and installation of signaling and telecommunication systems project Chachoengsao-Siracha-Laem Chabang (78 km.) with the total construction cost of 151.82 million US$.