IMPROVEMENT STUDY AND DETAILED DESIGN OF LAT KRABANG INLAND CONTAINER DEPOT (ICD3)

   
  1. To identify  the current capacity railhead, method to improve railhead, rail in both internal and external operation of ICD throughput to 1,000,000 TEUs of which 600,000 TEUs would arrive or leave by rail in near future.
  2. Carry out detailed design and plans of recommended option and necessary tender documents for implementation.  The total time scale of contract 14 weeks.

Detailed Description of Actual Services provided :

  1. Submitted the Inception Report on Sept. 2000.  Content of Work Schedule and Study Approach, Formulation of Options, ICD Operations Survey together with Appendices, Arranged Presentation to SRT.
  2. Submitted the Option Summary Report on Oct. 2000. Content of Formulation and Analysis of Option, The Preferred Overall Options, Conceptual Engineering of Recommended Options, Conceptual Engineering of Recommended Options, Implementation and Action Plans, Other Consideration and Draft Detailed Design of Recommended Options, Arranged Presentation to SRT.
  3. Submitted of Draft Final Report on Feb. 2001.  Content of  Executive Summary with Thai Translation, Introduction, Project Characteristics, Recommended Development, Implementation and Action Plan, Engineering and Cost Details, together with Appendices ie.  Cost and Productivity Comparison, Embankment Design, Estimate Additional Land Costs for Yard (Y3) and (Y4), Detail Drawing of Initial Stage Development and Long Term Development.