DETAILED DESIGN FOR THE ACCESS ROAD TO TA SANG HYDROPOWER PROJECT IN MYNMAR (TSHT2)

     
   

Construction and improvement of the access road from BP-1 check point to the construction project site of Ta Sang Hydropower Project in order to transport construction materials and equipment from Thailand.  The access is consisted of 2 lanes traffic, 3.50 meter lane width with the length of 145 kilometers.

Detailed Description of Actual Services provided :

  1. Selection of the best alignment.
  2. Site survey including longitudinal sections, cross sections and bridge site plan.
  3. Soil boring and material survey.
  4. Detailed engineering design for main traffic, intersections and other facilities.
  5. Preparation of tender documents and construction cost estimation.