Project Detail

PLAN IMPROVEMENT FOR THE RED LINE MASS TRANSIT : BANG SUE-RANGSIT AND BANG SUE STATION (BRMBS)

   

Review, analyze and evaluate related studies/policies and propose a preliminary design for a proper alternative including suggestions of investment model, detailed design and tender document improvement, environmental impact, and public relations for the project which include.

  • Elevated Railway from Bang Sue to Don Muang approximately 20 km. and At Grade Railway from Don Muang to Rangsit approximately 6 km.
  • Bang Sue Grand station Building approximately 79,840 m2,  with 1,600 cars underground parking, services road in station area 65,600 m2, parking area for buses 34,880 m2, parking for taxies 10,240 m2, and landscaping area 47,200 m2.
  • Long distance train and EMU depot and stabling yard in approximately 480,000 m2 or 300 rai.
  • Intermediate stations along the project route 10 stations.
  • Signalling, communication, and EMU systems covering Bang Sue-Rangsit and Bang Sue-Taling Chan Section.
  • Local road to accommodate the access to intermediate stations along the project route approximately 26 km.

Approximated engineering cost estimate is 77, 000 MB excluding the rolling stock cost.

Detailed Description of Actual Services provided :

  1. Review, analysis and evaluation of the related studies/policies and proposal of a preliminary design for proper alternative including investment model.
  2. Design and tender document improvement for the construction of Red Line Mass Transit: Bang Sue-Rangsit.
  3. Design and tender document improvement for the construction of Red Line Mass Transit: Bang Sue Station and Yard.
  4. Manage the design improvement and preparation of tender document for the railway system of Red Line Mass Transit: Bang Sue-Rangsit and Bang Sur-Taling Chan.
  5. Manage the preparation of Environmental Impact Report, public participation and public relations