STUDY AND DETAILED DESIGN OF THE RED LINE RAIL SYSTEM PROJECT, BANG SUE-MAKKASAN AND BANG SUE-HUA LAMPHONG SECTIONS (BMBH)

 
AEC was selected by the Office of Transport and traffic Policy and Planning (OTP) to undertake the detailed engineering design of the Red Line Rail System, Bang Sue-Makkasan, Bang Sue-Hua Lampong, and Makkasan-Hua Lampong sections.  The lengths for railway routes were  7 , 6 and 4 kilometers respectively.  The designs consisted of structural, civil and architectural works, system works, train station, local road and facilities that were divided into three parts as belows:

 

·         Review and evaluation of relevant studies/policies and preliminary design.

·         Study on environmental impact, public participation and public relations.

·         Detailed design and preparation of bidding documents

 

Consultants also prepared the definition design of the extension of the Airport Rail Link System (Phayathai-Bang Sue-Don Muang) and the TOR for tender management and construction supervision consultants, specification and tender documents including the following works :

 

·         Project management both in technical and general area.

·         Survey and topography mapping / soil and foundation examination.

·         Design of the stations and City Airport Terminal (CAT) at Bang Sue.

·         Design of signaling and telecommunications.

·         Design of electrification and power supply.

·         Construction cost and land acquisition estimation.

·         Construction planning , construction technique and construction-impact relief planning.

·         Bidding document preparation.

·         Study , detailed planning and method of practice  and impact evaluation.

·         Study an environmental impact, public participation and public relation.