AEC
  • Airport 2
  • Airport

Project Detail

SUVARNNABHUMI AEROTROPOLIS DEVELOPMENT PLAN

 

This project is dealt with development planning for the Suvarnabhumi Aerotropolis which covers the area within 100 km. surrounding the Suvarnabhumi Airport in Samut Prakarn, now under construction.  A development scheme is prepared for a 5-10 period, a 20-year period and a 30-year period starting from 2005.  The study includes also the overall socio-economic impact at the Metropolis level resulting from relocation of all airport related activities from the present Don Muang Airport to the Suvarnabhumi Airport.  Hence, the mitigation measures are recommended. Services included as follows:

  1. Study the overall socio-economic impact from relocation of all airport-related activities from Don Muang Airport to Suvarnabhumi Airport, particularly the direct socio-economic impact on the surrounding area within 5-10 km. from the two airports, and then recommend the mitigation measures.
  2. Review the relevant previous studies, the results from which are used as a basis for the development planning of the Suvarnabhumi Aerotropolis.
  3. Prepare the following 2 major development plans for a 5-10 year period, a 20-year period and a 30-year period starting from 2005 :-
    • A macro landuse plan of the area within 100 km surrounding the Suvarnabhumi Airport to support the growth of the Aerotropolis until 2035.
    • Inter-connecting networks of various utility and facility systems between Suvarnabhumi Airport and Bangkok area, the Eastern Seaboard Industrial area, the Upper Central Region and the Western Central Region.
  4. Prepare Action Plans including financial plan analysis for an investment on the development.