TYPICAL DESIGN FOR MTT NEW JETTIES (NO.3 & NO.4) PROJECT. (DMTT)

Typical Design for Map Ta Phut Tank Terminal including dredging work, ship maneuvering and jetties No.3 & No.4.

Detailed Description of Actual Services provided :

  • Set up design criteria for dredging work and jetties.
  • Locate dredging boundary and berth boxes.
  • Ship Maneuvering for berthing vessel.
  • Recommend the dredging method and dump area for dredged material.
  • Layout jetties (No.3 & No.4) and typical design for the jetties including construction method.
  • Estimate preliminary dredging volumes.
  • Preliminary cost estimate for dredging work and jetties construction.
  • Prepare implementation schedule of the project.